Prior approval for conversions across London

Home/Services/Prior approval (commercial to residential)

Commercial to residential prior approval.

Class MA permitted development lets many shops, offices and other commercial buildings in Use Class E become homes without full planning permission. The council assesses a set list of issues and must decide within 56 days. We design the homes, prepare the reports and make the application.

✓ Shops✓ Offices✓ Clinics & gyms✓ Upper floors

BeforeClass E · shop & offices
AfterClass C3 · new homes
Permitted developmentClass MA
DecisionWithin 56 days
Council fee£260 per home

Class MA, in short

What it is
A permitted development right to change a building from commercial use (Class E) to homes (Class C3), subject to prior approval.
Eligibility
The building must have been in Class E use for the 2 years before you apply, and not be listed or in a protected landscape.
How long
The council must decide within 56 days of a valid application.
Council fee
£260 for each new home in England (from 1 April 2026). Our design and reports are a separate fixed quote.

Sheet 01 — EligibilityClass MA · England

Can your building be converted under Class MA?

Since 5 March 2024 there’s no size limit and no requirement for the building to be vacant first. Conservation areas aren’t excluded, but a ground-floor change there is assessed for its effect on the area.

It can qualify if…

  • The building is in Use Class E, such as a shop, office, café, gym, clinic or nursery
  • It has been in Class E use for at least 2 continuous years before you apply
  • Every home meets the nationally described space standards
  • Every habitable room gets adequate natural light

It can’t if…

  • The building is listed or a scheduled monument
  • It’s in a National Park, National Landscape (AONB), World Heritage Site or SSSI
  • An Article 4 direction has removed Class MA rights, as many London boroughs have in some areas
  • It is a pub, takeaway or other use outside Class E

Sheet 02 — What’s assessedPrior approval matters

What does the council assess?

Prior approval isn’t a full planning application. The council can only consider this set list of matters, so the reports we prepare focus on each one.

  • TransportHighways safety, access and parking impacts.
  • FloodingFlood risk, with a flood risk assessment where needed.
  • ContaminationRisk from contaminated land on the site.
  • NoiseNoise from nearby commercial premises.
  • Natural lightAdequate daylight in every habitable room.
  • Conservation areaEffect of a ground-floor change on the area’s character.
  • Industrial areasEffect on nearby industrial, storage or distribution uses.
  • Nurseries & healthLoss of a registered nursery or health centre.
  • Fire safetyFor buildings 18 m or taller, or 7 or more storeys.

Sheet 03 — Space standardsMinimum gross internal area

How big do the new homes need to be?

Every home created under Class MA must meet the nationally described space standards. These are the minimum internal floor areas for some common sizes.

37 m²1 bed · 1 personWith a shower room (39 m² with a bath)
50 m²1 bed · 2 peopleSingle storey
61 m²2 bed · 3 peopleSingle storey
70 m²2 bed · 4 peopleSingle storey
74 m²3 bed · 4 peopleSingle storey
86 m²3 bed · 5 peopleSingle storey

Source: Technical housing standards – nationally described space standard. Bedroom sizes, ceiling heights and storage also apply.

Sheet 04 — Timescale56 days

How long does Class MA prior approval take?

The council has 56 days from receipt of a valid application. It consults bodies such as highways and the Environment Agency, and puts up a site notice.

Day 0714212835424956
Validation
Consultation
Assessment
Decision
Day 56
ValidationThe council checks the forms, fee, drawings and reports.
ConsultationSite notice, neighbours and consultees such as highways.
AssessmentThe officer reviews each prior approval matter.
DecisionApproved, approved with conditions, or refused.

Sheet 05 — Application packWhat we prepare

What do you need for a Class MA application?

  • Application form & feeSubmitted on the Planning Portal, with the fee per home.
  • Floor plansExisting and proposed, with room sizes and every window shown.
  • ElevationsExisting and proposed, where external changes are needed.
  • Planning statementShows the 2-year Class E use and addresses each matter.
  • Specialist reportsDaylight, noise, flood or transport reports where needed.

Sheet 06 — CostCouncil fees · England · from 1 April 2026

How much does Class MA prior approval cost?

The council fee depends on the number of homes. Design, drawings and any specialist reports are a separate fixed quote.

£260Per new homeClass MA prior approval, for each dwelling created.
£610Planning insteadPer new home (fewer than 10), if Class MA doesn’t apply.
56Days to decideFrom receipt of a valid application.
3 yrTo completeThe change of use must be completed within 3 years of approval.

National planning fees in England from 1 April 2026.

Sheet 08 — FAQs

Class MA questions.

Can’t see your question? Call us on +44 7594 188857 or email info@armdb.co.uk.

What is Class MA permitted development?

Class MA is a permitted development right in England that allows buildings in Use Class E (commercial, business and service uses) to change to homes (Use Class C3) without a full planning application. You need prior approval from the council on a set list of matters first.

How long does Class MA prior approval take?

The council must decide within 56 days of receiving a valid application.

How much does a Class MA application cost?

The council fee in England is £260 for each new home from 1 April 2026. Drawings, reports and application work are charged separately.

Does the building need to be vacant?

No. The requirement for the building to be vacant for 3 months was removed on 5 March 2024. It must have been in Class E use for a continuous period of at least 2 years before the application.

Is there a size limit for Class MA?

Not any more. The 1,500 m² floorspace limit was removed on 5 March 2024.

Can I use Class MA in a conservation area?

Yes, conservation areas aren’t excluded. But if the change of use involves the ground floor, the council will also assess its effect on the character of the conservation area.

Do the new flats need to meet space standards?

Yes. Every home created under Class MA must meet the nationally described space standards, and every habitable room needs adequate natural light.

Do Article 4 directions affect Class MA in London?

They can. Several London boroughs have Article 4 directions that remove Class MA rights in some areas, such as town centres or employment areas. We check this for your address before anything else.

Do I still need Building Regulations approval?

Yes. A change of use to homes needs Building Regulations approval, covering fire safety, sound insulation, energy efficiency and more.

Sheet 09 — CoverageLondon boroughs

Commercial to residential across London.

Every London borough has its own local plan, guidance and validation list. We work across Greater London from our office in Wimbledon, SW19, and also in Manchester, Birmingham and Liverpool.

LondonCroydonKingston upon ThamesMertonWimbledonSuttonBromleyGreenwichLewishamSouthwarkLambethWandsworthRichmondHackneyBarking & DagenhamBexleyManchesterBirminghamLiverpool

Sheet 10 — RelatedOther services

Related services.

Last updated: November 2026 · Fees and timescales are for England

Sheet 11 — Start here

Turn your building into homes.

Send us the address, its current use and how long it’s been in that use. We’ll check eligibility and send a free, no-obligation quote.

Free, no-obligation quote

Thank you. Your enquiry has been sent successfully. A member of the ARM Design & Build team will contact you shortly.

Architectural designers in London for measured surveys, planning drawings and buildable designs.

Find us

Dalton House
60 Windsor Avenue
London SW19 2RR

© 2026 ARM Design & Build. All rights reserved.PrivacyTerms

WhatsApp us