Prior approval for extensions across London

Home/Services/Prior approval (larger home extension)

Prior approval for a larger rear extension.

The larger home extension scheme lets you build a single-storey rear extension up to 6 m deep on a terraced or semi-detached house (8 m if detached) without full planning permission. The council consults your neighbours and must decide within 42 days. We draw it and handle the notification.

✓ Terraced & semi-detached✓ Detached houses✓ 42-day decision✓ £249 council fee

3D model of a 6 metre single-storey rear extension on a London terrace house 6 m deep3 m high
Neighbours consulted · 21 days
DepthUp to 6 m (8 m detached)
DecisionWithin 42 days
Council fee£249

Prior approval, in short

What it is
A notification to your council for a larger single-storey rear extension, under permitted development (Class A, larger home extension).
Who can use it
Houses only. Not flats or maisonettes, and not in conservation areas or where permitted development rights have been removed.
How long
Neighbours have 21 days to comment. The council must decide within 42 days, or you can go ahead.
Council fee
£249 in England (from 1 April 2026). Our drawings and notification are a separate fixed quote.

Sheet 01 — The limitsClass A · larger home extension

How big can a prior approval extension be?

These are the national limits in England. The depth is measured from the original rear wall, so any earlier extensions count.

6mMaximum depthBeyond the original rear wall of a terraced or semi-detached house.
8mIf detachedMaximum depth for a detached house.
4mMaximum heightSingle storey only, measured from ground level.
3mEaves near a boundaryMaximum eaves height if within 2 m of a boundary.

You can use it if…

  • It’s a house (terraced, semi-detached or detached)
  • The extension is single storey
  • Materials look similar to the existing house
  • Extensions and outbuildings cover no more than half the garden

You can’t use it if…

  • It’s a flat or maisonette
  • The house is in a conservation area or is listed
  • An Article 4 direction or planning condition removed the rights
  • The extension wraps around to the side or is two storeys

Sheet 02 — Which routeCompare

Standard permitted development, prior approval or planning?

The depth of your extension usually decides the route.

Up to 3 mStandard permitted development

Up to 3 m deep (4 m detached). No application needed; a Lawful Development Certificate confirms it.

LDC · about 8 weeksLawful Development Certificate →
Up to 6 mPrior approval

Up to 6 m deep (8 m detached), single storey. Neighbours consulted, decision within 42 days.

This serviceGet a quote →
Anything elsePlanning permission

Two-storey, side or wrap-around extensions, flats and conservation areas.

Target 8 weeksPlanning permission →

Sheet 03 — Timescale42 days from receipt

How long does prior approval take?

The council has 42 days from the day after it receives a valid notification. If it hasn’t told you its decision by then, you can build.

Day 071421283542
Notify
21-day neighbour consultation
Assessment
Decision
Day 42
NotificationWe submit the drawings, description and neighbours’ addresses.
ConsultationThe council writes to adjoining neighbours, who have 21 days to comment.
AssessmentIf anyone objects, the council looks at the effect on their light, outlook and privacy.
DecisionPrior approval given, not required, or refused, within 42 days.

Sheet 04 — Notification packWhat we prepare

What do you need for a prior approval application?

A complete, accurate notification avoids delays at the start of the 42 days.

Existing rear elevation drawing of a London terrace house
ExistingRear elevation · 1:100
Proposed rear elevation drawing with a single-storey rear extension
ProposedRear elevation · 1:100
  • Notification form & feeCompleted and submitted on the Planning Portal for you.
  • Dimensioned drawingsPlans and elevations showing depth, height and eaves height.
  • Site planThe house, the extension and the neighbouring properties.
  • Neighbours’ addressesEvery adjoining property the council must notify.
  • Written descriptionDepth, height and eaves height, as the rules require.

Sheet 05 — CostCouncil fees · England · from 1 April 2026

How much does prior approval cost?

The council fee is fixed nationally. Our survey, drawings and notification are a separate fixed quote.

£249Prior approvalLarger single-storey rear extension (Class A).
£274LDC insteadIf your extension fits standard permitted development (half of £548).
£548Planning insteadHouseholder planning application, if prior approval doesn’t apply.
42Days to decideCounted from the day after a valid notification.

National planning fees in England from 1 April 2026.

Sheet 07 — Good to knowAfter approval

After prior approval is given.

Before and after you build

  1. Build what was approved. The rules require the extension to match the details you submitted.
  2. Tell the council in writing when the work is finished, with your name, the address and the completion date.
  3. If it’s refused, we can amend the design, apply for planning permission instead, or appeal.

Still needed

Building RegulationsStructure, fire safety, insulation and drainage, checked by building control.
Party Wall ActNotices to neighbours if you build on or near a shared wall or dig foundations close to theirs.

Sheet 08 — FAQs

Prior approval questions.

Can’t see your question? Call us on +44 7594 188857 or email info@armdb.co.uk.

What is prior approval for a larger home extension?

It’s a permitted development route for single-storey rear extensions bigger than the standard limits: up to 6 m deep on a terraced or semi-detached house, or 8 m on a detached house. You notify the council, it consults your adjoining neighbours, and it decides whether their amenity would be harmed.

How long does prior approval take?

The council must decide within 42 days, starting the day after it receives a valid notification. Neighbours have 21 days to comment. If you haven’t been told the decision within 42 days, you can go ahead.

How much does prior approval cost?

The council fee in England is £249 from 1 April 2026. Drawings and the notification are charged separately; we give a fixed quote.

Can my neighbours stop a prior approval extension?

They can object, and the council must then consider the effect on their amenity, such as loss of light, outlook or privacy. It can only refuse on those grounds, not because a neighbour simply doesn’t want it.

Can I use prior approval in a conservation area?

No. The larger home extension scheme doesn’t apply in conservation areas or other protected land, on listed buildings, or where permitted development rights have been removed. You would need planning permission.

Can a flat use the larger home extension scheme?

No. It only applies to houses. Extensions to flats and maisonettes need planning permission.

How high can a prior approval extension be?

Up to 4 m high, single storey. If it’s within 2 m of a boundary, the eaves can be no higher than 3 m.

Do I need Building Regulations approval as well?

Yes. Prior approval only deals with planning. Building Regulations approval is still needed, and you may need to serve party wall notices on your neighbours.

Sheet 09 — CoverageLondon boroughs

Prior approval across London.

Every London borough has its own local plan, guidance and validation list. We work across Greater London from our office in Wimbledon, SW19, and also in Manchester, Birmingham and Liverpool.

LondonCroydonKingston upon ThamesMertonWimbledonSuttonBromleyGreenwichLewishamSouthwarkLambethWandsworthRichmondHackneyBarking & DagenhamBexleyManchesterBirminghamLiverpool

Sheet 10 — RelatedOther services

Related services.

Last updated: November 2026 · Fees and timescales are for England

Sheet 11 — Start here

Plan your bigger extension.

Send the address and how deep you’d like to go. We’ll confirm the route and send a free, no-obligation quote.

Free, no-obligation quote

Thank you. Your enquiry has been sent successfully. A member of the ARM Design & Build team will contact you shortly.

Architectural designers in London for measured surveys, planning drawings and buildable designs.

Find us

Dalton House
60 Windsor Avenue
London SW19 2RR

© 2026 ARM Design & Build. All rights reserved.PrivacyTerms

WhatsApp us