6–8 Metre Extensions Without Planning Permission? Here’s How Prior Approval Works

  • Home
  • Blogs
  • Blog
  • 6–8 Metre Extensions Without Planning Permission? Here’s How Prior Approval Works

Most homeowners assume that building a large extension means facing the full weight of a planning application, slow, complicated, and unpredictable. But that’s not always the case.

Thanks to Prior Approval, you may be able to extend your home by up to 6 or 8 metres without applying for full planning permission. It’s a faster, more flexible route designed for certain single-storey rear extensions, and it’s particularly useful for homeowners across London looking to improve their space without unnecessary red tape.

In this blog, we’ll explain how Prior approval for large home extensions in London works, including who qualifies, what limits apply, how the process unfolds, and tips from our experts at ARM Design & Build to help you avoid delays or rejection.

What Is Prior Approval?

Prior Approval is a streamlined process introduced under the UK’s Permitted Development Rights (PDR), allowing homeowners to construct certain types of extensions without going through the full planning application process. In simple terms, it’s a legal shortcut, but only when specific conditions are met.

For large single-storey rear extensions, Prior Approval provides a legal route to build beyond the usual development limits, provided that the local authority does not object on set grounds. This is particularly relevant for London homeowners, where garden space is limited and councils are often strict about design impact.

Under this system, if you live in a semi-detached or terraced property, you may be eligible to extend your home up to 6 metres from the original rear wall. If your home is detached, the permitted depth extends up to 8 metres. These allowances are measured from the original building footprint, not from any previous additions.

It’s important to note that Prior Approval applies strictly to rear extensions and only where the proposal is single-storey. It does not cover side or double-storey builds, or extensions in conservation areas or Article 4 Direction zones, which often apply in central London boroughs.

Unlike full planning permission, where councils can refuse proposals on subjective grounds such as aesthetics or overdevelopment, Prior Approval is based on a fixed set of criteria, including height, boundary distance, and neighbour impact. This creates more certainty, but also means every technical detail must comply exactly with the regulations.

At ARM Design & Build, we specialise in helping clients navigate the process of prior approval for large home extensions in London, ensuring your application is technically sound, correctly drawn, and fully compliant from day one.

Who Can Use Prior Approval in London?

Prior Approval is only available to homeowners living in a single dwellinghouse, meaning standard houses. If your property is a flat, maisonette, or a converted building, you won’t qualify. The right also excludes homes that have already used up their permitted development rights through previous extensions.

Certain areas of London come with added planning constraints. If your home is located in a conservation area, an Area of Outstanding Natural Beauty (AONB), or an Article 4 Direction zone, Prior Approval does not apply. These designations are common in boroughs like Islington, Hackney, and Camden, where councils restrict extensions to preserve heritage or urban character.

Eligibility isn’t just about property type, it also depends on planning history, boundary distances, and site conditions. That’s why checking the criteria early is crucial.

Unsure if your home qualifies? Let our experts help you decode the London prior approval rules for single-storey rear extensions.

Contact ARM Design & Build for a fast, expert review of your eligibility.

What Are the Main Rules for 6–8 Metre Extensions?

If you’re planning a large single-storey rear extension in London under Prior Approval, your proposal must strictly comply with the regulations set out in the General Permitted Development Order (GPDO).

Here are the key rules:

  • Maximum depth
    • Up to 6 metres for semi-detached or terraced houses
    • Up to 8 metres for detached houses
      Measured from the original rear elevation, not from a previous extension.
  • Maximum height:
    • Overall height must not exceed 4 metres
    • If the extension is within 2 metres of a boundary, the eaves height must not exceed 3 metres
  • Materials:

The extension must be constructed with materials that are visually similar to the existing property to maintain architectural continuity.

  • Restrictions:
    • No raised platforms, balconies, or verandas
    • No part of the extension can project forward of the principal elevation (front of the house)
  • Garden space limits

The total area covered by all extensions must not exceed 50% of the curtilage (the original garden area as it stood on 1st July 1948)

These are statutory limits, exceeding even one can invalidate your permitted development rights and force a full planning application.

Want to avoid delays or refusals? Let ARM’s experts show you how to get prior approval for 6m–8m extensions in London, quickly, legally, and stress-free.
Get in touch with our team today.

What Is the Prior Approval Process Like?

While simpler than full planning permission, the Prior Approval process still follows a structured pathway that must be executed correctly to avoid rejection.

Here’s how it typically works for large rear extensions:

Step-by-Step Breakdown

Prepare and Submit Application

Your submission must include a scaled site plan, existing and proposed elevations, and a location plan, all compliant with local validation standards.

Neighbour Consultation Period

The local authority notifies all adjoining neighbours. They have 21 days to raise objections under the Neighbour Consultation Scheme.

Council Assessment

Planners assess whether the extension negatively affects daylight, overshadowing, privacy, or visual amenity. Objections are only valid on these grounds, not personal opinion.

Decision Issued

If no valid objections are raised, or if they’re resolved, a decision is typically given within 6–8 weeks. However, some councils like Camden may ask for additional information or justification, which can add time.

Each council applies the process with minor variations, so knowing your borough’s exact expectations is key to a smooth outcome.

What If Neighbours Object?

Neighbour objections are a common concern in the Prior Approval process, but they don’t automatically stop a project. Under planning law, the council only considers material planning considerations, meaning objections must relate to measurable impacts such as:

  • Loss of natural light
  • Overshadowing
  • Overlooking and reduced privacy
  • Visual dominance or scale

Objections based on personal preference or minor disruption are not taken into account.

How ARM Design & Build Responds

When objections do arise, our team takes swift, professional action to keep your project on track:

  • Adjusting the layout or massing to reduce visual impact
  • Providing technical evidence, such as sunlight and daylight assessments in line with BRE guidelines
  • Recommending privacy screening, frosted glazing, or window repositioning to resolve overlooking issues

Thanks to our proactive design approach, 92% of neighbour objections are resolved without delay avoiding escalation and keeping approval timelines intact.

Worried a neighbour might object to your extension? Let ARM Design & Build manage your case with expert assessments and sensitive design revisions.

Get in touch today to protect your Prior Approval and move forward with confidence.

What Happens If It’s Refused?

A Prior Approval refusal does not mean your extension can’t go ahead, it simply means that your initial submission did not meet one or more of the requirements, or that valid concerns (such as neighbour amenity or design impact) were not adequately addressed.

Unlike a full planning refusal, a Prior Approval decision is based on a defined checklist. That makes it easier to revise and reapply once the issue is clarified.

Your Options After Refusal:

  • Revise and Resubmit: Minor adjustments to height, layout, or materials can often satisfy objections without starting from scratch.
  • Fallback Planning Application: If your proposal no longer qualifies under Prior Approval, we can convert the scheme into a full householder planning application, ensuring continuity in design and documentation.

At ARM Design & Build, we quickly assess the reasons for refusal and either amend the scheme or reposition your strategy; avoiding delays and keeping your build timeline moving.

Received a refusal or unsure how to proceed? Let ARM guide you through the next step; whether that’s a resubmission or full planning route.

Speak to our team today to recover momentum and unlock your project.

Why Choose ARM Design & Build in London?

Navigating the Prior Approval process for large home extensions isn’t just about submitting drawings, it’s about ensuring technical compliance, anticipating objections, and managing every step from concept to council sign-off.

At ARM Design & Build, we offer a fully managed service that includes:

  • Architectural drawings and design compliance tailored to permitted development criteria
  • Planning submission packs prepared to exacting council validation standards
  • Direct liaison with local authorities across London, including Hackney, Camden, Westminster, Islington, and more
  • Skilled response to neighbour objections with daylight assessments, design revisions, and mitigation strategies
  • Strict adherence to local policies, removing guesswork and costly oversights
  • Our strength lies in combining technical precision with deep local insight, ensuring your extension meets both regulatory and design expectations, on the first attempt.

Ready to extend without the stress? Partner with ARM for a smooth, fully compliant Prior Approval application in London.

Enquire now and take the next step with confidence.

Conclusion

For many homeowners in London, Prior Approval offers a smart, efficient route to building 6–8 metre rear extensions, all without the delays and uncertainty of full planning permission. But success depends on more than just eligibility. From technical compliance and neighbour objections to council expectations and local policy nuances, the process requires precision and experience.

That’s where ARM Design & Build comes in. We combine architectural expertise with an in-depth understanding of London’s planning environment to ensure your project moves forward, legally, smoothly, and on time.

Thinking of extending your home? Let ARM handle your Prior Approval large home extension in London from start to finish.

Contact our expert team today and build with confidence.

Leave A Comment

Related posts

Browse All

Everything You Need to Know About Change of Use Certificate in London

If you’re a property owner or a business planning to alter the way you use your premises, understanding the change of use certificate in London is absolutely essential. This certificate officially confirms that your property’s intended use complies with local planning regulations, helping you avoid potential legal complications. Ignoring this…

Measured Surveys in London – Costs, Process & Accuracy

Measured Surveys in London – Process, Accuracy, and Costs Planning an extension, renovation, or redevelopment in London? Before any work begins, one of the first and most important steps is arranging Measured Surveys in London. These surveys provide precise, detailed records of a property’s dimensions, layout, and structural features, forming…

Planning Permission in London: Key Requirements for Extensions and Renovations

Thinking about adding more space to your London home with an extension, or giving your property a much–needed renovation? Before the excitement of designs and builders takes over, there’s one crucial step you cannot overlook; planning permission in London. Many homeowners jump straight into their projects, only to discover halfway…

How Can Structural Design and Calculation Improve Building Safety in London?

Structural design and calculation refer to the process of planning, analysing, and verifying a building’s framework to ensure it can safely withstand loads, forces, and environmental factors throughout its lifespan. In a city like London, where space is limited, architectural styles vary widely, and construction must blend innovation with heritage.…

Lawful Development Certificate for Proposed Use in London: What You Need to Know Before You Build

Before starting any home improvement or construction project in London, it’s crucial to ensure your proposed plans are legally compliant. One of the most reliable ways to do this, especially if you’re building under permitted development rights, is by obtaining a Lawful Development Certificate for Proposed Use (CLPUD). This certificate,…

Why London Businesses Choose Us for 3D Modelling and Visualisation Projects?

In a city where architecture, design, and commerce move at lightning speed, 3D modelling and visualisation in London have become more than just creative tools. They are essential business assets. From sleek new residential towers in Canary Wharf to heritage building refurbishments in Westminster, businesses across the capital are embracing…
Browse All

Tags

3D Architectural Rendering Services UK 3D measured building surveys London 3D Measured Surveys in London 3d modelling and visualisation in London 3D modelling and visualisation services in London 3D modelling and visualisation UK 3D printing homes 2025 planning update Accurate 3D measured surveys London Accurate property surveys London ARM Design & Build ARM Design & Build planning permission Building structure analysis services London Building Survey Services London change of use certificate in London homeowner guide how to get a change of use certificate in London How to get prior approval for 6m–8m extensions in London London 3D measured survey services London 3D modelling and visualisation experts London change of use certificate process London planning permission London prior approval rules for single-storey rear extensions London structural design and calculation experts Manchester planning permission services Measured Building Surveys London Measured survey architects London Measured Surveys London MMC UK modern methods of construction modular housing UK panelised construction Planning permission for house extensions in London planning permission in London Planning permission large home extensions UK planning permission requirements in London planning permission vs change of use certificate Prior approval for large home extensions in London Prior approval large home extensions London Structural Design & Calculation services in London structural design and calculation in London structural design and calculation services in London Structural engineering and load calculations in London UK construction trends UK planning laws

ARM Design & Build is an integrated architecture and construction practice specializing in compliant, creative spaces.

Contact Info
Office Address

Dalton House, 60 Windsor Avenue, London, SW19 2RR

UP