Answers from architectural designers in London
Home/FAQs
Straight answers about planning permission, Lawful Development Certificates, prior approval, surveys, Building Regulations and working with us. Fees and rules are for England.
Sheet 01 — Planning permission, routes and timescales.
It depends on the property, its location and the work. Many small extensions and loft conversions are permitted development and don’t need an application. Flats, conservation areas, listed buildings and larger projects usually do. Send us the address and we’ll confirm the route. Planning permission guide →
Councils aim to decide householder and other minor applications within 8 weeks of validation. Preparing the survey and drawings comes first, and validation can take a week or two.
In England, a householder application costs £548 from 1 April 2026. Other fees depend on the type of application, for example £610 per new home for fewer than 10 homes. Our drawings and application work are quoted separately.
The decision notice gives the reasons. Often the design can be changed to address them and resubmitted. You can also appeal to the Planning Inspectorate; for householder applications the deadline is 12 weeks from the decision.
No one can guarantee a council’s decision. What we can do is tell you honestly, early on, if something is unlikely to be approved, and prepare an accurate, complete application that gives your project the best chance.
Yes. We submit the application through the Planning Portal, deal with the case officer’s questions and keep you updated until a decision.
Sheet 02 — LDCs, permitted development and prior approval.
A certificate from your council confirming that work or a use is lawful. For proposed work, it confirms it’s permitted development; for existing work, that it’s immune from enforcement or was lawful when done. LDC for proposed use →
For proposed work to a house in England, the council fee is £274 from 1 April 2026 (half the householder planning fee). For existing development, the fee is the same as the equivalent planning application.
Often, yes. If it has existed long enough, a Lawful Development Certificate for existing use can confirm it’s lawful. If not, a retrospective planning application may be the answer. LDC for existing use →
Since 25 April 2024, building work and changes of use in England generally become immune from enforcement after 10 years. Work substantially completed before that date may still benefit from the old 4-year limit.
A route for single-storey rear extensions up to 6 m deep (8 m detached) on houses. Neighbours are consulted and the council decides within 42 days. The council fee is £249. Prior approval guide →
Often, under Class MA permitted development, if the building has been in Class E use for 2 years and the homes meet space standards. You need prior approval, decided within 56 days. Class MA guide →
Sheet 03 — Measured surveys, drawings and visuals.
Most projects start with one, because planning and building drawings must show the existing building accurately. If you already have accurate drawings, we can work from those. Measured surveys →
Yes. You can book a measured survey, drawings or lease plans on their own, without committing to the full design and planning service.
As involved as you like. We start by listening to what you need, then share layouts and 3D views so you can comment before anything is finalised.
Yes. We can produce 3D models and visuals, including existing and proposed views from the same angle. 3D modelling →
Yes. Alongside houses, we work on flat conversions, HMOs, changes of use and commercial buildings.
Sheet 04 — Building control, structural calculations and party walls.
Usually, yes. Planning deals with what you can build; Building Regulations deal with how it’s built, covering structure, fire safety, insulation and drainage. Most extensions, lofts and conversions need both.
Yes. We prepare structural designs and calculations for beams, lofts, extensions and wall removals, ready for building control. Structural design →
Yes. Even a small change, such as removing a load-bearing wall, usually needs structural calculations and building control sign-off, and we can provide both.
If you work on a shared wall, such as cutting in a steel beam, or dig foundations near a neighbour’s, you must serve notice under the Party Wall etc. Act 1996, at least 2 months or 1 month before work starts depending on the type of work.
Sheet 05 — Areas, quotes and how to get started.
Our office is in Wimbledon, London SW19. We work across Greater London, and also in Manchester, Birmingham and Liverpool.
We lead the design, planning and compliance side. We don’t employ site labourers directly, but we can provide project management and connect you with contractors for the build.
Every project is different, so we give a free, no-obligation quote once we understand the property and what you want to do. Council fees are separate and set nationally.
Send us the address and a short description of your project using the contact form, or call +44 7594 188857. We’ll come back with the right next step and a quote.
No questions match your search. Try another word, or ask us directly.
Sheet 06 — Start here
Send us the address and what you’d like to do. We’ll answer your question and send a free, no-obligation quote.
Free, no-obligation quote

Architectural designers in London for measured surveys, planning drawings and buildable designs.
Core services